700-Acre Dual Rail – Sangamon
717 acres | New Berlin, Illinois
Top Site Advantages
Single owner
Free of floodplains
Zoned Agriculture, with a quick rezoning process
Comprehensive existing electrical infrastructure
Potential for dual-rail service
Utilities
Electric
Site vetted to meet 10 MW within ~12 months or 50-100MW within ~3-5 years.
Gas
After a line extension, site vetted to meet up to 200 mcfh at a maximum delivery pressure of 50 psig.
Water
After installation of infrastructure, site vetted to meet 500,000 GPD-1MGD within ~4 years or 1.5 MGD within ~8-10 years.
Wastewater Infrastructure
After installation of infrastructure, site vetted to meet 500,000 GPD-1.5 MGD within ~1 year.
Broadband Connectivity
Fiber to be installed, running from existing lines south of the property
Transportation & Logistic Assets
Proximity to Highway/ Interstate
2 miles to Route 54, 2 miles to I-72, 10 miles to I-55
Proximity to Airport
14 miles to Abraham Lincoln Capital Airport (regional), 110 miles to St. Louis International Airport
Proximity to Rail
Potential for dual-rail service. Rail lines along the northern and southern boundaries. Rail installation timelines: 12-18 months minimum. 50 miles to Midwest Inland Port intermodal facility; 10 miles to Midland Transload facility.
Additional Details
Workforce
1 hour DT: 194,274
Incentives
Foreign Trade Zone
Address
4818 S Farmingdale Road
New Berlin, Illinois
(39.73, -89.80)
Target Industries
- Manufacturing
Number of Owners
(1)
Available Reports
- Wetland Delineation
Divisable
Yes
Get In Touch
Interested in this vetted site? Let us know today!
"*" indicates required fields