Back to Vetted Sites

Top Site Advantages

Zoned Light Industrial
Rail served
Adjoining property available (under separate ownership)
Frontage on the Future of Pioneer Parkway Extension
Incentives: TIF District, Foreign Trade Zone, Enterprise Zone

Utilities

Electric

Site vetted to meet electric requirement of 10 MW with ~2-year lead time.

Gas

Site is greenfield and will need service extended after a study is performed. After extension, site could serve up to 200 mcfh at a maximum allowable pressure of 395 psi.

Water

Site vetted to meet water requirement of 1.5 MGD.

Wastewater Infrastructure

Site vetted to meet wastewater requirement of 1.5 MGPD.

Broadband Connectivity

Broadband and fiber on-site.

Transportation & Logistic Assets

Proximity to Highway/ Interstate

2 miles to Rt 6

Proximity to Airport

16 miles to Peoria International Airport, 155 miles to Chicago O'Hare International Airport

Rail Served Site

Direct rail available with Pioneer Industrial Railway (shortline), ~1 mile to Union Pacific Class I Railroad

Additional Details

Workforce

250,000 workers within 1 hour drive time.

Incentives

TIF District, Foreign Trade Zone, Enterprise Zone
Address

2700 W Altorfer Drive
Peoria, Illinois
(40.7896, -89.6354)

Peoria_County
Target Industries
  • Advanced Manufacturing
  • Warehousing
  • Distribution
  • Light Fabrication, Assembly, and Storage
  • Clean Industry
Number of Owners

Single Owner

Divisable

Yes

Get In Touch

Interested in this vetted site? Let us know today!