I-72 Dual Rail Site
389 acres | Springfield, Illinois
Top Site Advantages
Potential for dual Class I rail service (Norfolk Southern & CPKC)
Close to Abraham Lincoln Capital Airport
Single owner
0.5 miles to I-72
Additional acreage available
Utilities
Electric
After line extension, site vetted to meet 10-50 MW within ~2-3 years; 100 MW requires further study or a long-term PPA.
Gas
After line extension, site vetted to meet up to 200 mcfh with system reinforcement (max 50 psig).
Water
After main extension, site vetted to meet 500,000 GPD within ~12 months or 1-1.5+ MGD within ~30 months (requires additional infrastructure).
Wastewater Infrastructure
After installation of infrastructure, site vetted to meet 500,000 GPD-1.5 MGD within ~1 year.
Broadband Connectivity
Transportation & Logistic Assets
Proximity to Rail
On-site, potential for dual-rail service
Proximity to Highway/ Interstate
0.5 miles to I-72, 6 miles to I-55
Proximity to Airport
14 miles to Abraham Lincoln Capital Airport
Additional Details
Workforce
1 hour DT: 196,673
Incentives
Foreign Trade Zone
Address
5400 International Parkway
Springfield, Illinois
(39.74, -89.76)
Target Industries
- Food Processing
- TDL
Number of Owners
(1)
Divisable
Yes