Top Site Advantages

Enterprise Zone and TIF district
High water capacity
Rectangular & flat topography; free of floodplains & endangered species
Zoned General Manufacturing
Attainment Area

Utilities

Electric

Site vetted to supply 10 MW with ~18-24 month lead time and 50 MW with ~36 month lead time, with a potential for redundant service. For loads 100+ MW, new lines and an onsite substation would be needed with lead times around 36 months.

Gas

Site vetted to meet gas requirement of 50 mcfh at 10+ psig delivery pressure. Higher delivery pressures would require upstream improvements.

Water

Site vetted to meet water requirement of 1.5+ MGD.

Wastewater Infrastructure

Site vetted to meet wastewater requirement of 300,000 GPD with ~24 month lead time to supply 500,000 GPD. Site vetted for 1+ MGD with ~3-4-year lead time.

Broadband Connectivity

Broadband and fiber on-site.

Transportation & Logistic Assets

Proximity to Highways/Interstate

.5 miles to US-52/IL-26, .8 miles to I-88

Proximity to Airport

40 miles to Chicago-Rockford International Airport

Proximity to Rail

25 Miles to BSNF and UP access

Additional Details

Workforce

Labor Force (Mar 2024) | 1 Hour DT 4,372,065

Local Incentives Available

Enterprise Zone & TIF district
Address

E Corporate Drive
Dixon, Illinois
(41.8159, -89.4584)

Lee_County
Number of Owners

Two (2)

Available Reports
  • Water Delineation
  • Topographical Survey: Storm Water
Divisable

Yes