Top Site Advantages

Adjacent to Metra commuter rail
Robust adjacent power infrastructure
Direct rail service with NE frontage
Direct access to IL Route 45 and I-94
Industrial corridor

Utilities

Electric

Site vetted to meet 10 MW within ~24 months, or 50-100 MW within ~24-36+ months

Gas

Served by an 8" high-pressure main (218 psig); site vetted to meet 50 mcfh with no new infrastructure.

Water

Current capacity ~0.43 MGD. After infrastructure improvements, site vetted to meet 500,000 GPD within ~24 months or 1 MGD within ~36 months.

Wastewater Infrastructure

Pretreatment required. After installation of infrastructure, site vetted to meet 500,000 GPD-1.5 MGD within ~36 months.

Broadband Connectivity

Transportation & Logistic Assets

Proximity to Rail

Direct rail service

Proximity to Highway/ Interstate

6 miles to I-94, 1 mile to US Route 45

Proximity to Airport

25 miles to O'Hare International Airport

Additional Details

Incentives

Enterprise Zone

Workforce

1 hour DT: 3,891,087
Address

2301 & 2401 Mallory Drive
Libertyville, Illinois
(42.31, -88.01)

Lake-County
Target Industries
  • Food Processing
  • HQ/Financial/Technology
  • Life Sciences
Number of Owners

(1)

Available Reports
  • Phase 1 ESA
Divisable

Yes